![]() ![]() ^ Strømme, Simen Hunding (27 March 2021)."– Vemodig at det er slutt på norsk atomkraft". ^ "Norges siste atomreaktor stenges – milliardopprydning venter".^ "Regulatory and Institutional Framework for Nuclear Activities.In late 2012, Norway's privately owned Thor Energy, in collaboration with the government and Westinghouse, announced a four-year trial using thorium in an existing nuclear reactor. ![]() In 2010, Aker Solutions purchased patents from Nobel Prize winning physicist Carlo Rubbia for the design of a proton accelerator-based thorium nuclear power plant, but was subsequently sold to Jacobs Engineering Group in 2011. Statkraft together with Vattenfall, Fortum and the energy investment company Scatec announced plans to investigate building of a thorium-fueled power plant in 2007 which was never realized. There has been discussions about the possible usage of nuclear energy, which is supported by some industry leaders. In 2020 it was estimated dismantling the Halden and Kjeller research reactors and restoring the sites to unrestricted use will cost about NOK20 billion (US$2 billion) and take 20 to 25 years. ![]() In 2021, the Norwegian Green Party stated their support for development of nuclear energy as an alternative source of energy in order to reach the IPCC's goal of preventing global warming by 1.5 degrees. In 2019, Norway's last remaining nuclear reactor left in operation, the JEEP II reactor at Kjeller, was shut down after more than 50 years of service.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |